RDF: No change in Approved Promotional Peak
1. We manually change the System Effect Override measure for a particular Promotion Variable
(say: System Effect Override 1 - itm/str/week-Final 03 – Circular) for a particular product/location combination.
2. We set the Promo Effect Type as "Override All / Override Future Only" from the drop down.
3. We run a batch forecast after performing Steps 1 and 2.
4. We check the Forecast Appoval Workbook and find that there is no Forecast Approval Alert for the particular product/location combination. (The measure Forecast Approval Alert is unchecked).