Need advice on migration steps/plans/test
edited May 17, 2012 2:51AM in GoldenGate, Streams and Distributed Database (MOSC) 1 commentAnswered ✓
Hi, I have following questions. I have been playing around with GG for couple months now on and off.
Right now we need to migrate a prod environment to a new platform.
my questions are:
1). For a database with size of 1.5 tb, RAC on two nodes, asm instance and one physical standby database. And major table has lobsegmnents, what is the best way for initial load?
2). initial load of using transportable tablespace method, can we use the physical standby to do rman convert tablespace? Since physical standby already in read only mode, we can directly using rman to convert the tablespace, right?
Right now we need to migrate a prod environment to a new platform.
my questions are:
1). For a database with size of 1.5 tb, RAC on two nodes, asm instance and one physical standby database. And major table has lobsegmnents, what is the best way for initial load?
2). initial load of using transportable tablespace method, can we use the physical standby to do rman convert tablespace? Since physical standby already in read only mode, we can directly using rman to convert the tablespace, right?