Scheduled backups never run
I just upgraded from 10.2.0.3.0 to 10.2.0.4.12 (April2012 PSU) on Linux x86-64 (Redhat 4).
The backup jobs I schedule through OEM start on time. The Prebackup succeeds, but the Backup sits at Scheduled, and the start time updates every minute. So the job shows as "Running" but nothing is done.
I'm not sure if it's a problem with the extjob on the OS or if it's a timezone issue.
From what I've read the extjob has the correct permissions and the timezone version is correct at 4.
I don't see any errors in the alert log.
Any ideas where to look for errors? Or other places to look?
The backup jobs I schedule through OEM start on time. The Prebackup succeeds, but the Backup sits at Scheduled, and the start time updates every minute. So the job shows as "Running" but nothing is done.
I'm not sure if it's a problem with the extjob on the OS or if it's a timezone issue.
From what I've read the extjob has the correct permissions and the timezone version is correct at 4.
I don't see any errors in the alert log.
Any ideas where to look for errors? Or other places to look?
0