Landed Costs calculation according to the "Based on Level" field
P41291. Usually we set the cost component as a rate on the volume or as a percentage of the cost.
Landed costs can be calculated on the purchase order line or on the purchase order line plus a previous landed cost if we define “The Based on Level” field on cost component.
In our case we use the this field which allows a Landed cost to be calculated based on the purchase order line, plus an amount previously added by another landed cost level.
Please see the following exam :
Cost Level | Description | Percent of Cost | Plus Amount | Weight Rate | Volume Rate |