upgrading from P6 R8.1 to P6 R8.2
We are upgrading from P6 R8.1 to P6 R8.2. As part of this upgrade, we will be introducing BI and BPM. We currently have a dev and QA environment up and running. I want to start building the production environment. The P6 upgrades are easy, I can build the new P6/Weblogic instances and point them to QA database, and then repoint to production when that database is upgraded. But how do I do BI and BPM? Everything seems to be driven by the install script, and the existing environment is at R8.1. I can see all the datasource connection info