How to setup sampling plans in oracle quality??
we have defined the a sampling plan
Inspection Lot size sampling size
0 to 100 2
101 to 200 3
201 to 300 4
301 to 400 5
Now when we do the inspection for sampling size 4...if we reject 1...whole lot should not get rejected.
How do we set this up??
Thanks