Patch 9239090 US 12.1.3 Failing with ORA-03114: not connected to ORACLE
Created from SR
Middle of patching (12.1.3 US patch 9239090), specific jobs just runs, worker states:
Time when worker completed job: Tue Sep 25 2012 02:45:06
AD Worker error:
The following ORACLE error:
ORA-03114: not connected to ORACLE
occurred while executing the SQL statement:
UPDATE fnd_install_processes
SET skip_flag = ''
WHERE worker_id = 4
AD Worker error:
Error while deleting row from ad_util_params.
AD Worker error:
ORA-03114: not connected to ORACLE
Error while calling aidjawkExitJavaWorker()
It looks like the database was stopped or so, but this wasn't the case, and the alert says:
Tue Sep 25 02:44:21 2012
Completed checkpoint up to RBA [0x122.2.10], SCN: 148304469379