Changing Budgetory Control Level
HI
Can we change the budgetory control level form absolute to advisory after some encumbrance accounting is created.
Thnks
Shah
0
Can we change the budgetory control level form absolute to advisory after some encumbrance accounting is created.
Thnks
Shah