How to produce FG item with different revisons at simultaneously?
Can someone help me How to produce FG item with different revisons at simultaneously?
The following scenario explains the requirment
FGitem1.. current revision B in bulk production
Engineering department wants to change the Bill of material (some componenet change) or routing change(Process change) for some processs /cost improvement.
So that they want to produce some samples for the FG item with revision C with out stoppingt production of Revision B.
How can we release the WIP job orders for revision C and process the same
Thanks in advance