How do I calculate costing data of each routing in Oracle Discrete Manufacturing?
Dear All,
I have a problem about calculate cost:
My customer have 10 operations produce finished goods. My CFO want me built the system allow calculate costing of each operation. I had 2 solutions:
1/ I build 1 routing contain 10 operations, and build report calculate cost of each operation
2/ I build 1 routing/1 operation.
I think case 2 is complex, but it really strong. What do you think the solution best of this problem?. Thank you.
Regards,
CUONGNT (ntcuong01ct1@yahoo.com)
I have a problem about calculate cost:
My customer have 10 operations produce finished goods. My CFO want me built the system allow calculate costing of each operation. I had 2 solutions:
1/ I build 1 routing contain 10 operations, and build report calculate cost of each operation
2/ I build 1 routing/1 operation.
I think case 2 is complex, but it really strong. What do you think the solution best of this problem?. Thank you.
Regards,
CUONGNT (ntcuong01ct1@yahoo.com)
0