Advanced Scheduler not fetching the Group Resource
When I was scheduling a field service task, advanced scheduler is not fetching the group resource assigned to a territory but it is fetching rest of the individual resources assigned to the same territory.
Is it the normal functionality or do we need to change any setups?
Oracle Version: R12.1.3
Our requirement: Advanced scheduler should fetch both indivdual and group resources for task
Note: In Scheduling Rules, the Resource Type is left blank.
Thanks in Advance
Pavithara