Manual Production Scheduling
Hi ,
We are into OPM integration with ASCP.
As per the usual process, we release the batches from the planner workbench and later do to some parameter which is not captured in the system we want to schedule the batches manually.
This is due the shopfloor planning and availability of some gauges.
As of now, we have a custom form in the source to change the dates of the batches.
But we want to know whether it will cause any side effects in ASCP run.
We trigger the ASCP plan every day night.
Is it advisable to implement PS for scheduling. But the issue is we have some important parameter mapped out of oracle.
We are into OPM integration with ASCP.
As per the usual process, we release the batches from the planner workbench and later do to some parameter which is not captured in the system we want to schedule the batches manually.
This is due the shopfloor planning and availability of some gauges.
As of now, we have a custom form in the source to change the dates of the batches.
But we want to know whether it will cause any side effects in ASCP run.
We trigger the ASCP plan every day night.
Is it advisable to implement PS for scheduling. But the issue is we have some important parameter mapped out of oracle.