Attachments in Discrete Jobs
We've a customer requirement where Item Drawings need to be attached to the WIP job created (for the Assembly Item).
Since this needs to happen for all the WIP jobs,based on the item, is there a mechanism where
we attach the drawings to BOM/Routing of the item and they will be carried over to every job created for that Assembly item ?
0