1)We are facing issue some jobs are updated status as cancelled, but i have checked with user is not updated the status.
2) Again manually changed the status to Released.System is asking again Materials.
Ex we have 4 operations and 1 st operation we have issued all the required material.
3 operations are completed now the status changed to Cancelled.
Again user changed the status to Released.System again asking the material and automatically it went to 1st operation.If i dont want to execute the job how to take the material back from cancelled job or how to continue to complete the job.
1)We are facing issue some jobs are updated status as cancelled, but i have checked with user is not updated the status.
2) Again manually changed the status to Released.System is asking again Materials.
Ex we have 4 operations and 1 st operation we have issued all the required material.
3 operations are completed now the status changed to Cancelled.
Again user changed the status to Released.System again asking the material and automatically it went to 1st operation.If i dont want to execute the job how to take the material back from cancelled job or how to continue to complete the job.