MRP message OT - Multifacility Requirements Plans for Production Controlled Items
I have read in the manual "Multifacility Requirements Plans for Production Controlled Items"
After you set up supply and demand relationships among branch/plants, you can use the Distribution Requirements Planning (DRP), Master Production Scheduling (MPS), and Material Requirements Planning (MRP) gross regeneration versions of the Master Planning Schedule - Multiple Plant program (R3483) to generate a multifacility plan.
See "Generating Multifacility Requirement Plans" in the JD Edwards EnterpriseOne Applications Requirements Planning Implementation Guide.
You run the Master Planning Schedule - Multiple Plant program for production controlled items, and the system creates messages and time phases by production number.
The question is...the batch R3483 can create for Production Controlled Items more than one mrp message OT ( M30 -> S30 -> D30 branch relationship )...and maintain the production number in all OT msg MRP for the same production number?
After you set up supply and demand relationships among branch/plants, you can use the Distribution Requirements Planning (DRP), Master Production Scheduling (MPS), and Material Requirements Planning (MRP) gross regeneration versions of the Master Planning Schedule - Multiple Plant program (R3483) to generate a multifacility plan.
See "Generating Multifacility Requirement Plans" in the JD Edwards EnterpriseOne Applications Requirements Planning Implementation Guide.
You run the Master Planning Schedule - Multiple Plant program for production controlled items, and the system creates messages and time phases by production number.
The question is...the batch R3483 can create for Production Controlled Items more than one mrp message OT ( M30 -> S30 -> D30 branch relationship )...and maintain the production number in all OT msg MRP for the same production number?