Unable to generate PR for OSP resorce work order

edited Feb 27, 2013 7:44PM in Discrete Manufacturing - EBS (MOSC) 2 commentsAnswered
 Hi,

We created OSP item and attach to Resource and we used this resource in OSP work order. when we release that work order we need to get PR but it was stucked in Interface lines with below error.

   "Item must be of type 'OUTSIDE OPERATION' for an outside operation line
Cause:        You entered an invalid item for the line type that you entered.  You must enter a outside-operation item if you enter an outside-operation line type.  
Action:        Enter an outside-operation item."

 