we are running two nodes RAC 10.2.0.4. and we are planning to upgrade it to 11.2.0.3 on RHEL 5.5. we wan this upgrade with minimum downtime. and to achive this , rolling upgrade whould be the best.
well i go throwgh with metalink notes and from from that notes i found