Upgrading from A7.3 to A9.1 or beyond and considering WIP Revaluation to adjust open Work Orders dur
In A7.3 the variance flag values are : blank, 1 and 2. Three, 3, does not exist in this release. Therefore a work order is considered 'closed' when the flag has a value of 2. The A7.3 release does not support WIP Revaluation.
If as of A9xx, you are considering running frozen cost update (P30835) with WIP Revaluation option activated to adjust open work orders for cost updates, the variance flag (PPFG) will need to be changed from 2 to 3 for work orders that were created and processed in A7.3. The use of a file utility tool will be needed to update the PPFG = 2 to PPFG = 3 for existing work orders that have had Variance accounting (P31804) run in final mode.
If as of A9xx, you are considering running frozen cost update (P30835) with WIP Revaluation option activated to adjust open work orders for cost updates, the variance flag (PPFG) will need to be changed from 2 to 3 for work orders that were created and processed in A7.3. The use of a file utility tool will be needed to update the PPFG = 2 to PPFG = 3 for existing work orders that have had Variance accounting (P31804) run in final mode.
0