It 's possible to perform these 2 task at the same time?
It 's possible to perform these 2 task at the same time?
. in FAT DEVELOPER CLIENT deploy a package in DV environment
. in the DEPLOYMENT SERVER build/deploy of a package in DV environment
(for this situation: same environmet and same full/update)
exist corruption of data?
problem in tables_space?
jde:9.0
db:oracle
os:linux
thanks!