Hello,
This is on r12.1.3
We have two GL Journal batches from last year. Batch 1: belongs to November 2012 and Batch 2 belongs to December 2012. Both batches are in POSTABLE status.
We need to post these two batches in March 2013 period. Currently above two batches have Nov-2013 and Dec-2012 period assigned respectively.
How can we post above two batches in March 2013? Or is it possible given POSTABLE status?
Please advise.
Darsh
This is on r12.1.3
We have two GL Journal batches from last year. Batch 1: belongs to November 2012 and Batch 2 belongs to December 2012. Both batches are in POSTABLE status.
We need to post these two batches in March 2013 period. Currently above two batches have Nov-2013 and Dec-2012 period assigned respectively.
How can we post above two batches in March 2013? Or is it possible given POSTABLE status?
Please advise.
Darsh