Supply Type for the Configured Model
Had configured a multi level Model BOM, the Job Resulted out fo this holds the Componenet of the top most Model item configured will all the list of componenets (as all the below confgured model item has supply as Phantom).
As the COnfigured Model landed up as supply type 'Phantom' this happened.
The Expectation is for each level, where we create in a Indented strcture, a seperate work order to be created for each configuration in a strcture.
Please advice how to achieve this.
Br
Aravinth