Do we still need signal "ABOGetFutureAsset"?
Hi,
we have some issues with promotion integrity validation on Quote/Orders when the Lines are existing assets that we suspend or disconnect.
In previous versions of Siebel 8 (8.1.1.5 and before), we use to have signal ABOGetFutureAsset, which was raised by BS ISS Promotion Management Service. Then we migrated our server and repository to version 8.1.1.7 and signal "ABOGetFutureAsset" was gone.
We had to add it manually otherwise disconnect Order would fail promotion integrity check.
now we are introducing the Suspend/Resume scenarios and Quote for assets to be suspended fail integrity validation.
If we disable signal "ABOGetFutureAsset" Promotion Integrity check is successful.
0