Manufacturing how to handle scrap at operations in the middle of a manufacturing route
Hi to all
we are using superbackflush as the wo completion mode.
we are still on XE, but making a parallel upgrade to 9.1, so if this can't be handled in xe, but is possible to handle in 9.1 I would also like to know
and I have read E1: 31: P31116 Understanding Parent and Component Scrap [ID 862393.1] and
now the problem
we have times when we detect that we have a defective product in the middle of a manufacturing route (ie, in a 7 steps route, we detect this at the 4 step), the product could be repaired in line and continue production, but we want to inform this, let me put an example
we are using superbackflush as the wo completion mode.
we are still on XE, but making a parallel upgrade to 9.1, so if this can't be handled in xe, but is possible to handle in 9.1 I would also like to know
and I have read E1: 31: P31116 Understanding Parent and Component Scrap [ID 862393.1] and
now the problem
we have times when we detect that we have a defective product in the middle of a manufacturing route (ie, in a 7 steps route, we detect this at the 4 step), the product could be repaired in line and continue production, but we want to inform this, let me put an example