Move Based Resource Charging
As the assemblies you build pass through the operations on their routings, move transactions charge all pre–assigned resources with an auto–charge type of WIP Move at their standard rate.You can charge resources based upon a fixed amount per item moved in an operation (Item basis) or based upon a fixed lot charge per item moved in an operation (Lot basis). For resources with a basis of Lot, Work in Process automatically charges the lot cost upon completion of the first assembly in the operation.
How would I know the accounting or DR/CR that being hit by the move?. There is no view accounting on the form that I can verify. Please note that I am still on 11.5.10
0