Another M8000 installation question...
We are going to move a M8000 plus power cabinet from one site to another. The cabling routing system (ethernet, fiber) is a overhead infraestructure with Panduit Fiber Runners, but I don't see any cable inlet on the top of the M8000 rack. We have to deliver the cables through one side and then the bottom cable inlet or exist a better way to do this?