Cost Roll up when component branch is in different currency
Hi
I am setting up a BOM in which the header Branch is in USD and in the detail component Branch is sourced from another branch in a different currency. When I tried to simulate roll up the system added the cost directly in foreign currency and did not convert it to the base currency. Any idea if I am doing something wrong?
Thanks
Govind