Using RAT on RAC
Hello everyone
We are planning to use Real Application Testing to test our 2 node 11.2.0.2 RAC upgrade to 11.2.0.3
We have some questions on the subject
1. Do we need to capture the the work load from both instance or from one instance only?
2. If we capture the work load from one instance, can we replay it on any instance on the target node?
3. If we capture load from both instances, can we replay in both the target instances in parallel or should we replay
it on one instance first and only when its done on instance # 1, replay it on instance # 2
4. We can PRE-PROCESS and REPLAY on the same TARGET database. Correct?