Hello

When the PO is cancelled (related requisition line is not cancelled) the requisition lines that are matched to those PO are getting doubled?

E.g. we have a PO with one line and matched to a requisition which ihas got one line, now when the Po is cancelled requisition lines increaed to 2 from 1 and in some cases the values are different as well

Thanks

RK