Moving CPU's from Solaris Resource Pools
Workload - Oracle DB, OS Solaris 10 U10 SPARC, Hardware : M series.
System is having Zones and the CPU Pool with 40 VCPU is allocated to the Zones. This CPU Pool is mix of SPARC VII and SPARC VII+ CPU. There are eight SPARC VII CPU's and we need to move them from the main pool to the default pool.
Here is the steps, I am planning to follow.
Original Setup
root@reg-xxx# poolstat -r pset
id pool type rid rset min max size used load