Line Type SC, Budget Check and % of completion
I want to share the following case
It is required to control the stock levels of items to be bought and issued for a Job cost
Line type SC is used to check budget and update inventory; however there is still some missing chain in the final solution which is summarized bellow
Project items are defined with line type SC
Job cost is setup in the Job Master and the Job is defined as Branch Plant as well
Job cost budget is setup for cost codes and cost types
DMAAI 4310 is setup for these items
PO document type is setup in 40/CM and the processing options of P4310 is setup to check budgte