I have 10 user who want to use EPPM R8.3 with:
-P6 Web
-TeamMember.
-WebServices.
-Professional Client R8.3
All in SP1.
But on sizing doc I found this:
A small deployment:
App server: 4 gb ram
Database server: 8 gb ram
P6 Services: 8 gb ram.
It is needed to have P6 Services in another server or can be on App server?????
Why so much resources if I am going to have only 10 user working but not at the same time on Primavera R8.3
Thanks,
My doubt is this:
I have 10 user who want to use EPPM R8.3 with:
-P6 Web
-TeamMember.
-WebServices.
-Professional Client R8.3
All in SP1.
But on sizing doc I found this:
A small deployment:
App server: 4 gb ram
Database server: 8 gb ram
P6 Services: 8 gb ram.
It is needed to have P6 Services in another server or can be on App server?????
Why so much resources if I am going to have only 10 user working but not at the same time on Primavera R8.3
Thanks,
1