What will be the cost of the final product when I do return and the the cost of the componenet has b
The BOM B is composed of Item X (qty 1) with cost 10 and Item Y (qty 2) with cost 20 USD. Currently B cost is zero
Create a wip job number J200 for the item B with qty 3 to complete
complete the job
close the job
Cost relieved in Job : 150
Assembly Cost is 150
Currently Cost incurred =150
Cost relieved =150
Net activity = 0
X cost = 10
Y cost = 20
B cost = 50
now the cost of Y has been changed to 25
Open the Job above J200
do a complete return of item B the BOM for 1 Qty
close the job J200
What will be the new cost of B?