How is the cost of the final product is calculated when I return against this final product
I am using average costing
Create a wip job number : J3000 for qty 3
Complete Job
close the job
Cost relieved in Job : 150
Assembly Cost is 150
Currently Cost incurred =150
Cost relieved =150
Net activity = 0
X cost = 10
Y cost = 20
B cost = 50
the new cost is calculated as below: qty 1 of X = 10 + qty 2 of Y = 20 so the final cost is 50 of Item B and since the original cost of B is zero so the final cost of B is 50
now open the job