Plan Design Copy - Significance of effective date
Hi,
What is the significance of the effective date in Plan Design Copy?
I have plans configured with effective date of 1/1/1951, but I also have rates configured effective 1/1/2014
Should I use the effective date as of 1/1/2014 while doing plan design copy export?
Thanks
0