Invoicing uses ship confirm date, we need it to use the date interface trip stop was run.
Ship confirm is one step, trip finalization (as we call it) is the next and last step. Trip finalization prints our BOL and runs Interface Trip Stop (ITS). Ship confirm produces only the pack list. Our DCs ship confirm (signaling the shipment is ready) and trip finalization occurs ONLY when the carrier shows up. This assures the product has actually left the building. We had issues in the past where ship confirm shipped and interfaced the order then the carrier does not show up and we roll over a month end. Oracle thought it was gone but physically the product was on
0