Promoting OMW Project
Hello everyone,
I have a project in OMW JDE E1 and here are the activity that i've done.
- Create project and promote it from 11 to 21
- Under this project i add a batch version after the testing is done i check it in and the promote it from 21 to 26
- Then promote from 26 to 28
- Then I try to promote it from 28 to 38 so that the batch version that i created can be available in Production, but when I select the 38 in the project status Change it gave me an error " 38 not found in User defined Code H92 PS".
I check it in the UDC H92 PS in DV, PY and PD and there is no 38. what should I do? It is required to setup the activity rule 38 in UDC H92 PS?
I have a project in OMW JDE E1 and here are the activity that i've done.
- Create project and promote it from 11 to 21
- Under this project i add a batch version after the testing is done i check it in and the promote it from 21 to 26
- Then promote from 26 to 28
- Then I try to promote it from 28 to 38 so that the batch version that i created can be available in Production, but when I select the 38 in the project status Change it gave me an error " 38 not found in User defined Code H92 PS".
I check it in the UDC H92 PS in DV, PY and PD and there is no 38. what should I do? It is required to setup the activity rule 38 in UDC H92 PS?
1