MES Auto Check-out option

edited Dec 9, 2013 10:44PM in Discrete Manufacturing - EBS (MOSC) 1 commentAnswered
Hi,

We are looking for a option to Auto clock out in case of move operation from one operation to another operation and we are in EBS R12.1.3

For example, in Job Op10 operator clock-in. After Run & To Move steps without clock-out, the operator moves the job to next sequence Op20. In this case, system should Clock-out from Op10 automatically and that time to be captured.
Let me know is the standard MES functionality supports this.

Thanks in Advance

Kamaraj