Weighted average cost 02 questions
Hi to all
currently we are using standard costs 07 for all our items
we use a mix of configurated and standard products, at all manufacturing stages (prime materials, semi elaborated and end items)
I have been reading about weighted average cost method 02, and have several questions.
1. If you use cost method 02 for prime materials, you never have to simulate and freeze those items at cost method 02?
2. If you use cost method 02 for standard semi elaborated or end items, how and when is the new weighted average cost of this semi elaborated or end items calculated?
3. do you need to simulate and freeze cost method 02 for standard semi elaborated or end items?, how this combine with changing costs at manufacturing?
currently we are using standard costs 07 for all our items
we use a mix of configurated and standard products, at all manufacturing stages (prime materials, semi elaborated and end items)
I have been reading about weighted average cost method 02, and have several questions.
1. If you use cost method 02 for prime materials, you never have to simulate and freeze those items at cost method 02?
2. If you use cost method 02 for standard semi elaborated or end items, how and when is the new weighted average cost of this semi elaborated or end items calculated?
3. do you need to simulate and freeze cost method 02 for standard semi elaborated or end items?, how this combine with changing costs at manufacturing?
0