Incompatibility rules for Concurrent Program
Hello All,
I'll appreciate your thoughts an ideas in the following requirements for concurrent request Lost Cost Process:
1. We do not want the two LCPs to run under the same legal entity simultaneously.Under US legal entity( LE-1) we have another legal entity ( Say LE-2). If we run the LCP from LE-2 and at the same time under LE-1 it should not allows us to run.
2. Now we have other legal entities ( say for Canada - LE-3), USST ( Say LE-4 ) and USSC ( Say LE-5) .Now when I am having a LCP running from LE-1 or LE-2 then if I run LCP for LE-3 or LE-4 or LE-5 it should run.
I'll appreciate your thoughts an ideas in the following requirements for concurrent request Lost Cost Process:
1. We do not want the two LCPs to run under the same legal entity simultaneously.Under US legal entity( LE-1) we have another legal entity ( Say LE-2). If we run the LCP from LE-2 and at the same time under LE-1 it should not allows us to run.
2. Now we have other legal entities ( say for Canada - LE-3), USST ( Say LE-4 ) and USSC ( Say LE-5) .Now when I am having a LCP running from LE-1 or LE-2 then if I run LCP for LE-3 or LE-4 or LE-5 it should run.
0