After Rollback PSU, do I have to do something like "downgrade catalog"
I am testing a Rollback Szenario for the current oct-2013 PSU.
After PSU Apply I had upgraded the rman catalog. Now I am testing the rollback. Rollback of PSU itself ways easy and with no errors. resync of the rman catalog is working, but do I have to downgrade the rman catalog as well ?
PSU 11.2.0.2.0 -> 11.2.0.2.12
Kind Regards
Vero