Can't Do Completion for Non-Standard Job
Hi Everyone,
I have problem in non-standard job flow. I have assembly item 'IMDB', the UOM is KG, the quantity is 4.4 KG and material requirement component for this assembly item is just 'IL-010', the UOM is Meter, the required quantity is 17 Meter, the supply type is Assembly Pull.
---------------
IMDB (4.4 KG)
- IL-010 (17 M)
----------------
When i doing the completion there is show the error message: ' Total transaction quantity must be less than or equal to available to complete'.
And then i check the material transaction for this job, the WIP Issue have created for 'IL-010' 17 Meter, but there is no WIP Completion created for 'IMDB'.
I have problem in non-standard job flow. I have assembly item 'IMDB', the UOM is KG, the quantity is 4.4 KG and material requirement component for this assembly item is just 'IL-010', the UOM is Meter, the required quantity is 17 Meter, the supply type is Assembly Pull.
---------------
IMDB (4.4 KG)
- IL-010 (17 M)
----------------
When i doing the completion there is show the error message: ' Total transaction quantity must be less than or equal to available to complete'.
And then i check the material transaction for this job, the WIP Issue have created for 'IL-010' 17 Meter, but there is no WIP Completion created for 'IMDB'.
Tagged:
0