Material Overhead at WIP Issue
I have a need to apply a 20% cost to all items issued from Inventory to a work order. What is the best method to do this? I tried to use Material overhead at the sub-element set up but that does not allow me to enter a rate. Is there something else I should be doing?
Thank you in advance, Barbara
Thank you in advance, Barbara
0