Link PCM and P6
Hi everyone,
I am having issue while linking PCM and P6. I made all the settings as per document Doc ID 914068.1. I can import projects in P6 but in PCM project settings schedule is greyed (disabled).
while using ping "http://localhost:7001/exponline/myprimavera.do?mpaction=ping" i am getting response "Project Controls Active". what can be the issue.
Thanks