Primavera CONTRACTOR v 6.1
I am a new user to Contractor but used SureTrak for 15 years.
How do I modify the various relationship lines (i.e.- change the appearance of the line)?
Does Contractor distinguish between the various types of relationship lines (driving, non-driving, critical)
0