In india localisation, 57F4 challan also shows the OSP item attached to OSP resource.
HI,
I have done the setup as per the India Localisation requirement for OSP. When I try to create a 57F4 challan through Approve 57F4 dispatch using refrence PO, Which was created for OSP item (attched to OSP resource).
Alongwith the Item in BOM which is at OSP oeration , it also shows OSP item in PO. in 57F4 Challan screen.
As per the standard practise 57F4 challan should only have the item which we are sending for OSP.
What setup I have missed?