Hi;
I have a requirement to calculate the actual_cost and standard_cost for a specific assembly. Now the report must consider the historical costs as well, meaning depending on the period Im running the report
the relevant unit_cost must be considered as well.
To give you an example. The Item ,eg bread is made up of different components(flour, ingredients etc) so I need to calculate the cost on bread as well as the component level.
Regards