If there are 2 recipes of the same product and the validity rule date of the recipes is partial but covers the entire costing period in total e.g. RCP_01 version 1 starts from 01-Jan-1014 and end at 15-Jan-2014, and RCP_01 version 2 starts from 16-Jan-2014 to 31-Jan-2014. Would the standard cost rollup able to perform the cost rollup of this product and if so, what is the logic system compute the standard cost of this product.

Thanks in advance.