Migration Steps from 10g to 11g on Windows
Hi All, We are currently running on 10g (10.2.0.5) on Win 2003. It's a 2 node RAC with ASM.
Now migrating to 11g R2 (11.2.01 or 11.2.0.4) on Win 2012.
What are the parameters and Configurations that I need to make note from the current environment before I go for the fresh installation on new environment.
I am quite familiar with the installation part which is Grid Infrastructure followed by Database software. What are the next steps that I need to follow to migrate the existing env to new env.
Can Somebody give me the step by step guide to follow. Appreciate your help. Thank you all in advance.