Two Drill-Through Options Available in Planning Data Form
We are using two separate FDM applications (version 11.1.2.1) to load data to two different plan types (Plan Type 1 and 2) in an EPMA-enabled Hypeion Planning application. The major differences between the two cubes are one has a Position dimension whereas the other does not and Plan Type 2 excludes several of the accounts that are irrelevant. However, both FDM applications load data to the accounts that are shared across both plan types - one loads data by position (Plan Type 2) the other one is a consolidated load (Plan Type 1). The loads work as intended; however, from