Steps from RAC perspective during rolling upgrade to Linux 6.
Hi,
We have a 2 node 11.2.0.4 RAC databases with Rhat Linux 5.7
We want to perform rolling upgrade when we do Linux 6 upgrade.
"removing one node from your RAC environment, performing a fresh install of Linux version 6 and migrating RAC environment and database to it. "
Step 4.2.3 in following document talks about rolling upgrade, but we are looking for more detail steps.
http://docs.oracle.com/cd/E16655_01/install.121/e17888/prelinux.htm#CWLIN174
Can someone please suggest.
Thank you